Daystart for a new channel

The daystart is required before the Breakbuilder Setup for this channel is possible. It should reflect how a day is planned in the scheduling system since the interfaces usally are delivering the days according to their day start in the scheduling system like WhatsOn.

The daystart has only settings that are relevant for Starhub:

  1. The day start time
  2. the channel

This needs to be setup for each channel before using the Setup BB/PP in the next chapter.